Fill the drilled holes and tops with the balusters with Loctite adhesive. Situation the balusters in to the holes and safe the handrail on top of the balusters. Jim measured and drilled holes roughly each and every 4″ for that balusters on both of those the handrail and ground. Welcome to Garrison Road Design and style Studio! I'm the creat